WFC Tower Two Flood Barrier
Services:
Challenges Solved
Following Superstorm Sandy, Mueser Rutledge Consulting Engineers (MRCE) developed an emergency flood barrier system for WFC Tower 2 that includes watertight marine doors with inflatable seals and gasket seals, and flood-log barriers custom manufactured by Presray and EKO, two leading manufacturers of temporary, permanent or removable systems.
MRCE investigated and provided construction supervision for the storm hardening of the existing basement level perimeter slurry wall utility penetrations, including floating ventilation closures for existing ventilation duct openings within electrical vaults.