Connecticut State Pier Complex
Challenges Solved
The Connecticut Department of Transportation (CDOT) Pier Complex Improvements commissioned this pier upgrade in which the berthing areas adjacent to the existing piers and bulkheads were deepened to accommodate larger container ships.
MRCE performed the geotechnical subsurface investigation and designed an anchored sheet pile bulkhead to manage the increased water depth after dredging.