New Exelon Headquarters Campus
Challenges Solved
Harbor Point’s Exelon development supports a 25-story tower, a 10-story parking garage with an energy trading floor on its large roof, all located on a remediated hazardous waste site. Innovative designs obtained agency approval for penetrating the existing Multi Media Cap (MMC) to install deep foundations. MRCE structural designs minimized excavation depths for cost savings. A 1-story garage with green roof supporting a park, street systems, and utility corridors was supported on a unique foundation system which utilized a single high capacity driven pile below each column. MRCE provided construction inspection for all foundation construction.